This project was the first part of a national roll out stretching over the next few years.
The huge drive to switch to the use of electric vehicles has meant that our client required 20% of their spaces changing to EV charging spaces.
From the initial feasibility survey to the installation of the units we managed the project from start to finish.
This site required and upgrade to the current board & then around 25M of hard dig to get to the chosen spaces. We then installed 3 columns with 2 EV charging points on each to cover 6 spaces. We also installed a Matt-e unit next to the new board.
We had to liaise with site to shut down one evening to make all final connections.
Once completed we repainted the line marking.
The site has now got 6 spaces available for its electric vehicle fleet.
We are now in the process of working with our client to continue the roll out across the other sites in the UK.